Land & energy, of record.
No. 004Book 1 · Page 4Filed for record November 1, 2026archiveledger.com
6 5 4 3 2 1 7 8 9 10 11 12 18 17 16 15 14 13 19 20 21 22 23 24 30 29 28 27 26 25 31 32 33 34 35 36 A SURVEY TOWNSHIP · 36 SECTIONS · N.M.P.M. Sections 2, 16, 32 and 36 of every township: granted to New Mexico for schools (Enabling Act, 1910) An illustrative two mile lateral through Sections 21 and 28 (accent line)

Down and Across

How Americans learned to drill, lift and move oil on land, what a Permian well looks like in the autumn of 2026, and the robots, electric fleets and satellites promised next.

On the record

A fourth entry, on one subject: how a well is made. Section I follows drilling from Drake’s 69 feet to the first fractures, pipelines and conservation laws. Section II reads the record of October 2026, when a Permian well runs two miles sideways. Section III weighs what is promised next.

I · Chain of TitleLooking back

Sixty-nine feet

Edwin Drake drove an iron pipe to rock and found oil at 69 feet in 1859. In the hundred and twenty years that followed, the rotary rig, the cone bit, the blowout preventer, the log, the fracture and the pipeline made that hole an industry, and each left a rule an examiner still reads.

Recorded
Book 1 · Page 4
Section I
11/01/2026
The Ledger · No. 004
Archive Ledger, Inc.

On August 27, 1859, on Oil Creek near Titusville, Pennsylvania, Edwin L. Drake and his driller, William Smith, called Uncle Billy, found oil standing in a hole 69 feet deep [1], [2]. The method was a salt driller’s. When the old way would take the hole no deeper than 16 feet, Drake drove an iron pipe down to the rock, a drive pipe he never patented, and Smith worked through rock and shale at an average of about three feet a day [1], [3]. The well gave a few dozen barrels a day: the American Society of Mechanical Engineers puts it at 1,000 gallons daily for three years, a Penn State history at an estimated 20 to 40 barrels [1], [3]. The Energy Information Administration’s national series begins with that year, at 2 thousand barrels, and counts 500 thousand the next [4]. The Pennsylvania Historical and Museum Commission calls it the first successful commercial oil well [2]. Its backers had less faith in it than history does. The venture, renamed the Seneca Oil Company of Connecticut, had given up on Drake by the time of the strike and did not reimburse him for the well for four years. In October 1859 Smith set the well on fire inspecting the oil with an open lamp [3]. What followed was a century of machines for going deeper and of rules for sharing what they found.

The tools were older than the well. On the Kanawha River in western Virginia, where the Ruffner brothers built the first commercial salt furnace in 1808, saltmakers boring for brine devised well-drilling tools that petroleum drillers later adapted [5]. One of them is on record: on September 4, 1841, William Morris of Kanawha County received Patent No. 2,243 for a sliding connection between the auger and its heavy sinker, which let the bit and sinker fall and strike while it “relieves the poles above from the jar” [6]. Drake’s successors drilled with cable tools. A heavy bit on a cable was dropped on the bottom of the hole again and again, and every few strokes the crew stopped to haul the cuttings out, a start and stop that the landmark history puts at about 25 feet a day [7]. On April 25, 1865, E. A. L. Roberts patented a way to set off a charge of powder deep in a water-filled well, the well torpedo [8]. The power changed under the same rigs; the museum at Drake’s site traces drilling from manual work to steam and then to gas engines [2].

The rotary rig made its name on the Gulf Coast. Anthony F. Lucas spudded a well at Spindletop, near Beaumont, on October 27, 1900, for Guffey and Galey of Pittsburgh, with Al and Curt Hamill of Corsicana, who drilled with a heavier rotary bit [10]. On January 10, 1901, at about 1,100 feet, mud and then oil came out of the hole, and the Lucas gusher flowed an estimated 100,000 barrels a day for nine days before it was capped [10], [11]. The field yielded 17,500,000 barrels in 1902 [10]. Many historians, the ASME history notes, date the cheap-oil era from that gusher and from the switch from the cable tool to the rotary rig [7].

Spindletop’s soft sands suited the rotary; hard rock did not. The rig then used one bit, the fishtail, which scraped and stalled in hard formations [7]. In 1908 Howard R. Hughes and Walter Sharp built a model of a roller bit with two cone-shaped cutters, each with 166 cutting edges, that chipped and crushed rock instead of scraping it, and Hughes’s Patent No. 930,758 was granted on August 10, 1909 [7], [9]. They tested the bit at Goose Creek, Texas, in 1908: on the first try the pipe twisted off, and on the second, by the Hughes Tool biography the landmark history quotes, Hughes drilled fourteen feet of hard rock in eleven hours and found the Goose Creek field. The partners founded the Sharp-Hughes Tool Company in 1909, in a rented shop twenty by forty feet [7]. The landmark history gives a case from the House No. 1 well of the Producers’ Oil Co. at Humble, Texas: below 1,819 feet a fishtail bit made 38 feet in 19 days, and the cone bit 72 feet in 6, six times the rate at a quarter of the cost per foot [7]. Hughes Tool commercialized the three-cone Tricone bit in 1933, and the three-cone patent of Floyd L. Scott and Lewis E. Garfield issued on December 4, 1934 [7], [12]. During the seventeen years of that patent, Hughes Tool’s share of the market approached 100 percent [7].

one well, one hard rock, two bits: House No. 1, Producers' Oil Co., Humble, Texas, below 1,819 feet 0 2 4 6 8 10 12 14 2 ft a day Fishtail bit 38 feet in 19 days 12 ft a day Hughes two cone bit 72 feet in 6 days feet a day THE RESULT Six times the footage 75% lower cost per foot The cone bit chipped and crushed the rock the fishtail could onlyscrape. A cable tool crew made about 25 feet a day in generalpractice. ASME, Hughes Two Cone Drill Bit, landmark 246 (2009): case study of the House No. 1 well and the cable tool rate.
Fig. 1Feet drilled a day through the same hard rock at the House No. 1 well, Humble, Texas: the fishtail bit against the Hughes two-cone bit, as the ASME landmark history reports the case, with the cable tool’s general rate for scale [7].

Deeper holes met higher pressures. In 1922 James S. Abercrombie, a wildcatter, and Harry S. Cameron, a machinist, worked out a ram-type blowout preventer at Cameron’s shop in Humble; the design held up to 3,000 psi, was marketed in January 1924 and was patented on January 12, 1926 [13]. Seeing underground came next. On June 4, 1921, on a farm north of Oklahoma City, Karcher, Ohern, Haseman and Irving Perrine showed that a reflection seismograph could map structure below the surface, and in December 1928 Amerada struck oil near Seminole in the first well drilled on a structure the method had found [14]. On September 5, 1927, a team led by Henri Doll ran the first electrical well log, in a 500-meter well at Pechelbronn in Alsace, and the company now called SLB began surveys in the United States on August 17, 1929 [15].

drilling, seeing, lifting and moving oil on land, 1808 to 1972, with the law it produced 1800 1820 1840 1860 1880 1900 1920 1940 1960 1980 1808 Salt wells Kanawha tools later usedfor oil 1841 The drilling jar Morris patent No. 2,243 1859 Drake, 69 feet Driven pipe at Titusville,Aug. 27 1865 First oil pipeline About 5 miles from Pithole 1879 Tidewater line 109 miles across theAlleghenies 1901 Spindletop Rotary rig, Jan. 10; anestimated 100,000 barrelsa day 1909 The cone bit Hughes patent, Aug. 10;rotary through hard rock 1919 Rule 37 Texas spaces wells toprotect correlative rights 1922 Ram blowout preventer Cameron and Abercrombie,3,000 psi 1927 to 1928 Logs and seismic First electric log; firstreflection discovery 1935 Hot Oil Act And the New Mexico OilConservation Commission 1943 Big Inch 24 inches, Texas to theEast 1947 to 1949 Fracturing Hugoton test; 332 jobs in1949 1972 First CO2 flood SACROC, Scurry County,still producing U.S. patents 2,243, 930,758; ASME landmarks 40, 227, 246; PHMC markers; THC marker; SLB; Oklahoma Historical Society; AAPG Explorer; NETL; RRC; 15 U.S.C. 715b; NM OCD.
Fig. 2Drilling, seeing, lifting and moving oil on land, 1808 to 1972, with the rules the industry produced. Dates from patents, landmark histories, state markers, agency histories and statutes [1], [5], [6], [9], [11], [13], [14], [15], [16], [17], [18], [19], [20], [21], [22], [23].

Lifting oil was mechanized in the same years. W. C. Trout developed a pumping unit for Humble Oil in the 1920s, perfected in the Goose Creek field; pumping units carried Lufkin through the Depression, and by 1973 it had built more than 100,000 of them [24]. The first fracture was an experiment in Kansas. In 1947 Stanolind fractured the Klepper No. 1 in the Hugoton field, Grant County, at 2,400 feet, with a thousand gallons of a napalm mix of palm oil, naphthenic acid and gasoline and sand from the Arkansas River [22]. Halliburton, its licensee, ran the first two commercial jobs in March 1949, near Duncan, Oklahoma, for $900 and at Holliday, Texas, for $1,000, and did 332 that first year; by 2013, the AAPG history reports, the Department of Energy estimated that at least two million oil and gas wells had been fractured [22]. In 1972 carbon dioxide injection began at the SACROC Unit in Scurry County, Texas, now the oldest CO2 enhanced recovery operation in the United States [23].

Oil also had to be moved. In the fall of 1865 a pipeline about five miles long pumped oil from Pithole to the railhead at Miller Farm, and its trench is still visible [16]. On May 28, 1879, the Tidewater Pipe Co., an early rival of Standard Oil, began pumping 109 miles across the Alleghenies to Williamsport [17]. The law then sorted pipe from production. The Hepburn Act of June 29, 1906 made those who carried oil by pipe line common carriers under the Interstate Commerce Act, excepting water and natural or artificial gas, and Texas declared its pipelines common carriers under its Railroad Commission in 1917, by the Pipeline Petroleum Law, Senate Bill 68 [18], [25]. The Natural Gas Act of June 21, 1938 reached interstate transport and sales of gas for resale, but not “the production or gathering of natural gas” [26].

The largest lines of the era were built for a war. Work on the 24-inch Big Inch began on August 3, 1942, and it was finished by August 14, 1943, from Longview, Texas, toward Phoenixville, Pennsylvania; with the 20-inch Little Big Inch, completed in March 1944, it carried over 350 million barrels east before May 1945 [21]. Texas Eastern bought both lines for natural gas for $143,127,000, final on November 14, 1947 [21]. The country had produced 63.6 million barrels in 1900 and 898 million in 1930, and 1,974 million in 1950, on its way to 3,517 million in 1970, computed by The Ledger from EIA’s series [4].

0 1,000 2,000 3,000 4,000 U.S. crude oil production, million barrels a year; the 1970 peak highlighted 0.5 1860 5.3 1870 26.3 1880 45.8 1890 63.6 1900 210 1910 443 1920 898 1930 1,503 1940 1,974 1950 2,575 1960 3,517 1970 3,146 1980 U.S. Energy Information Administration, U.S. Field Production of Crude Oil (annual, thousand barrels). The series begins with 2 thousand barrels in 1859. Million barrels computed by The Ledger from the thousand-barrel values.
Fig. 3United States crude oil production every tenth year, 1860 to 1980, in million barrels a year, computed by The Ledger from the Energy Information Administration’s annual series; output peaked in 1970 [4].

Each of these machines raised the same question of property. Owners above a common pool raced each other to it, and the Supreme Court answered in Ohio Oil Co. v. Indiana on April 9, 1900 that each surface owner held “a coequal right in them all to take from a common source of supply,” which a state could protect against waste [27]. Texas gave its Railroad Commission jurisdiction over production in 1919, and the Commission’s Rule 37 set minimum distances between wells to protect field pressure and correlative rights [18], [28]. When the East Texas field flooded the market in the early 1930s, the Commission began to set the rate at which every well in the state could produce, the practice called proration [28]. The Commission’s reach grew with the industry: rates for gas utilities in 1920, the odorization of gas after the New London school explosion of 1937, liquefied petroleum in 1939, and in the 1960s a place as the model for OPEC [18]. The Connally Hot Oil Act of February 22, 1935 made oil produced above a state’s limits contraband in interstate commerce [19]. New Mexico’s Oil and Gas Act of the same year created the three-member Oil Conservation Commission, and the state’s pooling statute, now NMSA 1978 70-2-17, lets the Division pool owners who have not agreed, allocate production by surface acreage and charge a nonconsenting owner up to 200 percent for risk [20], [29].

The machines left two kinds of record. One is on paper: spacing exceptions, proration and pooling orders in the agencies’ files, and pipeline grants and easements in the county records, each the product of a rule that drilling made necessary [18], [29]. The other is in the ground. Texas plugged a record 2,022 orphaned wells in fiscal 2026, at a cost of $125,643,478 [30]. The question Drake’s well first raised is the one a two-mile lateral asks in 2026: when oil moves to a well, whose oil is it?

II · Of RecordThe present

Two miles sideways

A new Permian well runs about two miles sideways, and the first four-mile laterals were drilled in 2026. Rigs are back to 603 across the country, each drilling more wells than in early 2025, while the gas waits on new pipe and a lateral that crosses eight tracts asks the law who shares the oil.

Recorded
Book 1 · Page 4
Section II
11/01/2026
The Ledger · No. 004
Archive Ledger, Inc.

On August 5, 2026, Permian Resources reported that it had drilled its first four-mile laterals, horizontal sections of about 21,120 feet, computed by The Ledger [31]. It expects to bring about 250 wells online in 2026 at an average lateral of about 11,000 feet [31]. On August 19, 2026, the Energy Information Administration put numbers on the change: the average new horizontal well in the Permian Basin ran 6,149 feet sideways in 2015 and 10,867 feet in 2025, 77 percent longer, and super-laterals over 15,000 feet, almost unknown before 2020, were 15 percent of the basin’s new completions [32]. Wells under 5,000 feet fell from 43 percent of completions to 4 [32].

The horizontal well is older than the boom. In 1975 the Department of Energy’s National Energy Technology Laboratory worked with industry on the first horizontal shale well with seven separately fractured intervals, and in 1985 it mapped fractures in real time with microseismic sensors in Colorado [33]. On September 25, 1987, Meridian Oil completed the first horizontal well in North Dakota’s Bakken for 258 barrels a day; its lateral ran 2,603 feet, and it took 57 days and $2 million to drill and complete [34]. What turned the technique into an industry was cheap fracturing. A Mitchell Energy shale well fractured with sand, water and chemicals “hit big in 1997,” and Devon Energy bought the company in 2002 for $3.5 billion [35]. From 2010 to 2021, the laboratory notes, citing EIA, about 81 percent of completions were horizontal or directional, and U.S. crude output more than doubled while gas withdrawals rose 55 percent with 66 percent fewer wells completed [33]. Crude production, 1,829,880 thousand barrels in 2008, passed the 1970 record by 2019 and reached 4,986,606 thousand in 2025 [36].

length of the horizontal part of a well, in feet; mile marks at 5,280 feet 0 1 mile 2 miles 3 miles 4 miles First horizontal Bakken well Meridian #33-11, completed Sept. 25, 1987 2,603 Average new Permian lateral, 2015 EIA, from Enverus data 6,149 Average new Permian lateral, 2025 EIA; 77 percent longer than 2015 10,867 Super laterals begin, 2025 15 percent of new Permian completions 15,000 A four mile lateral, 2026 first drilled by Permian Resources about 21,120 NDGS Newsletter, 2005 (the 1987 well); EIA Today in Energy, Aug. 19, 2026 (Enverus data); Permian Resources, Aug. 5, 2026. Four miles = 21,120 feet, computed by The Ledger; the company did not publish the exact length.
Fig. 4How far a well runs sideways: the first horizontal Bakken well (1987), the average new Permian lateral in 2015 and 2025, the super-lateral threshold and a four-mile lateral of 2026, whose length is computed by The Ledger [31], [32], [34].

The rigs came back in 2026. On October 30, 2026, Baker Hughes counted 603 active rigs in the United States, 57 more than on October 31, 2025: 588 on land, 527 drilling horizontally, 462 aimed at oil [37]. The Permian had 272, against 251 in October 2025; Texas had 275 and New Mexico 99 [37]. The Railroad Commission of Texas issued 759 original drilling permits in September 2026, after 693 in July and 695 in August, and its Midland district alone accounted for 323 new holes; the Commission processed 961 oil and 280 gas completions that month [38], [39]. The prices behind the count are 2026’s: EIA expects Brent to average $96 a barrel in 2026 after the closure of the Strait of Hormuz [40].

Each rig now does more. EIA’s Short-Term Energy Outlook of October 6, 2026 counts 302 Permian rigs in the first quarter of 2025 and 264 in the third quarter of 2026, with the wells each rig drilled in a quarter rising from 4.8 to 5.6; the 264 rigs drilled 1,490 new wells, more than the 1,440 drilled by 302 [40]. The basin needs every one. In EIA’s one-year trend for the third quarter, new Permian wells added about 477 thousand barrels a day while existing wells lost about 479 thousand, and the stock of wells drilled but not yet completed fell from 1,295 to 844 [40].

0 50 100 150 200 250 300 350 Permian active rigs by quarter; beneath each, new wells drilled per rig in the quarter 2025 Q1 4.8 wells a rig Q2 5.0 wells a rig Q3 5.1 wells a rig Q4 5.3 wells a rig 2026 Q1 5.5 wells a rig Q2 5.6 wells a rig Q3 5.6 wells a rig 302 282 258 250 242 248 264 EIA, Short Term Energy Outlook, Oct. 6, 2026, Table 10a. Baker Hughes counted 272 Permian rigs on Oct. 30, 2026. In 2026 Q3, 264 rigs drilled 1,490 new wells, against 1,440 drilled by 302 rigs in 2025 Q1.
Fig. 5Permian active rigs by quarter, 2025 to the third quarter of 2026, with the new wells drilled per rig in each quarter, from EIA’s Short-Term Energy Outlook of October 6, 2026 [40].

Production set records anyway. EIA’s monthly series, released October 30, 2026, puts U.S. crude at 13,965 thousand barrels a day in August, Texas at 5,710 thousand and New Mexico at 2,442 thousand, the highest month in a state series that begins at 203 thousand in January 1981 [41], [42]. EIA forecasts U.S. output of 13.9 million barrels a day in 2026 and 14.3 million in 2027, with the Permian at 6.81 million and 7.14 million [40]. The oldest technique in the basin is still at work: at SACROC, the Scurry County unit where carbon dioxide injection began in 1972, Kinder Morgan’s net oil rose 11 percent to 20.05 thousand barrels a day in the third quarter of 2026, out of 27.07 thousand from all its CO2 fields [43]. The mood in the field is cooler than the counts. In the Dallas Fed Energy Survey released on September 30, 2026, the business activity index fell to 38.8 from 46.1 while the oil production index rose to 20.7, and executives expected West Texas Intermediate at $88 at the end of 2026 [44].

Gas is the constraint. EIA puts Permian marketed gas at 27.6 billion cubic feet a day in 2025, 29.5 in 2026 and 32.0 in 2027, all of it needing gathering, processing and pipe out of the basin [40]. Energy Transfer said on August 4, 2026 that its Hugh Brinson Pipeline was in commercial service and expected to carry its full first-phase 1.5 billion cubic feet a day by September 1; it had placed the 275 million cubic feet a day Mustang Draw I processing plant in service in the Midland Basin in June and added more than 90,000 barrels a day of Permian natural gas liquids capacity on Lone Star Express [45]. Enbridge reported on August 6, 2026 that Blackcomb, built to move up to 2.5 billion cubic feet a day to Agua Dulce, had begun commissioning beside the operating 580-mile Matterhorn Express, also 2.5 [46]. Energy Transfer had also finished a 14-mile lateral off Hugh Brinson at Abilene [45]. On October 2, 2026, EIA reported record U.S. gross withdrawals of 137 billion cubic feet a day in July, with Texas and New Mexico up 1.7 billion from June as new pipelines eased the bottleneck [47].

The commitments run years ahead. On August 17, 2026, Targa Resources signed 20-year agreements with ExxonMobil running through 2046, covering gathering, processing, treating, NGL transport and fractionation, and announced three Delaware Basin processing plants of about 825 million cubic feet a day, with a 70-mile residue line to Waha, for the first half of 2028 [48]. Enbridge listed the Eiger Express, up to 3.7 billion cubic feet a day, for mid-2028 and a sanctioned Bay Runner Twin of up to 2.6 billion toward Rio Grande LNG [46]. On October 21, 2026, Kinder Morgan announced a final investment decision on Permian Link, about 2.8 billion cubic feet a day on about 434 miles of new pipe, for 2030, at about $4.2 billion [43].

A lateral that long is a title event. New Mexico builds standard horizontal spacing units from governmental quarter-quarter sections of 40 acres, so a two-mile lateral down the middle of a two-section unit crosses eight of them, computed by The Ledger [49]. Before the permit, the state requires the consent of at least one working interest or unleased mineral owner in every tract the completed interval penetrates, or a compulsory pooling order [49]. Its Division pools owners who have not agreed, allocates production by surface acres, and may charge a nonconsenting owner up to 200 percent of that owner’s share of the cost for risk [50]. Texas does not require pooling for every horizontal well that crosses a property line. In Railroad Commission of Texas v. Opiela, decided June 30, 2023, the Austin court of appeals held that “production through a PSA well is not the same as pooling,” even under a 1955 lease that barred pooling, yet it sent the permit back because the Commission erred in finding a good-faith claim to drill. The parties then settled, and on January 31, 2025 the Supreme Court of Texas, without considering the merits, granted review, vacated the court of appeals’ judgment and returned the case to the trial court; under the appellate rules such an order does not vacate the court of appeals’ opinion unless it says so, and this one does not [51], [52], [53].

illustrative: one two mile lateral across a 1,280 acre unit of two sections; tract letters fictional A B C D E F G H section section surface location Each square is a quarter quarter section, 40 acres; the unit holds 32. The lateral (accent) crosses tracts A to H, about two miles. New Mexico Before the permit: consent of at least one workinginterest or unleased mineral owner in each of tracts A toH, or a compulsory pooling order (19.15.16.15 NMAC). The Division pools owners who have not agreed;production is allocated by surface acres (NMSA 70-2-17). A nonconsenting owner may be charged up to 200percent for risk, out of production. Texas Pooling is not required for every horizontal well thatcrosses a lease line: the operator may seek an allocationwell permit or a production sharing agreement (PSA)well. Allocation: production goes to the tract where it iscaptured. PSA: the owners agree how it is shared. Opiela (Tex. App. 2023): a PSA well is not the same aspooling. The judgment was vacated on a settlement onJan. 31, 2025; the opinion was not. 19.15.16.15 NMAC; NMSA 1978 70-2-17; Railroad Commission of Texas v. Opiela, No. 03-21-00258-CV (Tex. App. Austin 2023); Supreme Court of Texas No. 23-0772.
Fig. 6An illustrative two-mile lateral across a 1,280-acre unit of two sections, with what New Mexico and Texas require of it. The tract letters are fictional; the rules are the agencies’ and the courts’ [49], [50], [51], [52].

New Mexico’s gas rule adds a date: operators must capture at least 98 percent of the gas they produce, in each of two reporting areas, by December 31, 2026 [54]. That is a beginning, not an end. Each new lateral leaves a pooling order or a production sharing agreement behind it, each new plant a long dedication and a line of easements, and an examiner will meet them in the record before the next well is drilled.

III · Future InterestsWhat is being built

The well that runs itself

Two rig floors in the Permian now run on robots, a fracturing job has run itself, and one major has promised half its shale rigs to automation by 2028. What is proven, what is promised, and what each change does to a lease, a surface and a royalty.

Recorded
Book 1 · Page 4
Section III
11/01/2026
The Ledger · No. 004
Archive Ledger, Inc.

On October 7, 2026, Helmerich & Payne said that two of its FlexRobotics systems were doing the repetitive work of the rig floor on rigs drilling for ExxonMobil, keeping crews out of the higher-risk tasks, and that it expected to deploy seven more within twelve months [55]. On October 26, 2026, ExxonMobil said it plans to automate more than half of its unconventional drilling rigs by the end of 2028, estimated that automation could eliminate roughly a third of high-consequence drilling incidents, and said it expects to keep similar staffing; it counted 1,000 horizontal wells drilled in the New Mexico Delaware Basin since 2017 in a December 2024 item [56]. Two systems are in service. The rest is a plan and an estimate.

Automation has reached the frac spread as well. Halliburton says its ZEUS IQ platform ran a fracturing job in Colorado’s DJ Basin in March 2025 that adjusted its own pumping schedules, volumes and rates from surface and subsurface data, without human intervention [57]. The company’s account gives no measured results. Software that steers the bit is older than the robots. SLB said in September 2022 that its Neuro autonomous directional drilling had been deployed on more than 50 rigs in 10 countries and had drilled 612,000 feet in 131 customer wells; on one Middle East well it cut the commands sent down to the tool by 33 percent and raised the rate of penetration 13 percent against wells drilled by hand [58].

what has happened, and what is promised, as of Oct. 31, 2026 Has happened Is promised ROBOTS ON THE RIG FLOOR Two H&P FlexRobotics systems working for ExxonMobil (Oct.7, 2026). Seven more within a year (H&P); half of ExxonMobil'sunconventional rigs automated by the end of 2028. AUTONOMOUS FRACTURING One job run without hands on the controls, DJ Basin, March2025 (Halliburton). No fleet-wide figure published. FOUR MILE LATERALS Drilled by Permian Resources (2026) and Chord, whose firstfive-well four mile pad came on in 2026 Q1. Chord: about 40 percent of its 2026 wells, 60 percent ofspuds. GAS AND NGL INJECTION One Bakken pilot: cumulative oil up about 253 percent overfive months (EERC, 2026). Since July 4, 2025, the 45Q credit pays the same for EOR asfor storage. ELECTRIC FRAC FLEETS Over half of Halliburton's North American fleet in 2025. Liberty: about 3 GW of power projects by 2029. A GRID FOR THE PERMIAN 765 kV import paths recommended by PUCT staff, April 2025:$10,114 million. Permian load of 26,400 MW in 2038 (ERCOT study). CARBON CAPTURE First Texas Class VI permits, three Ector County wells (EPA,Apr. 7, 2025). STRATOS operating in 2027 (Occidental, Aug. 2026). METHANE FROM ORBIT Tanager-1: 14,400 methane plumes published by Aug. 16,2026. Three more Tanager satellites (Carbon Mapper). Company releases and filings (H&P, ExxonMobil, Halliburton, Permian Resources, Chord, Liberty, Occidental); EERC; 26 U.S.C. 45Q; PUCT; ERCOT; EPA; Carbon Mapper.
Fig. 7Eight technologies, what has happened and what is promised as of October 31, 2026, from company releases and filings, the research center, the statute, Commission staff, ERCOT, EPA and Carbon Mapper [55], [56], [57], [59], [60], [61], [62], [63], [64], [65], [66], [67], [68], [69].

The well is getting longer. Permian Resources drilled its first four-mile laterals in 2026, and Chord Energy brought its first full four-mile spacing unit online in the Williston Basin in the first quarter, a five-well pad drilled mostly in single runs; Chord plans about 40 percent of its 2026 wells, and 60 percent of its spuds, as four-mile laterals [59], [60]. Its outlook for 2026 has 135 to 165 wells brought online, about 40 percent of them three-mile laterals and about 40 percent four-mile [60]. It reported the pad’s capital costs in line with expectations, helped by fracturing more than one well at a time [60]. Old wells are getting second fractures. ConocoPhillips reported more than 50 mechanically isolated refracs in the Eagle Ford by August 2021, which it said added on average 75 percent more reserve recovery at a fraction of a new well’s cost [70]. A Department of Energy field test in the Midland Basin, reported in 2023, found that adding fracturing stages “does not always correlate with a commensurate increase in production,” and tested refracturing through a new liner [71].

For a lessor the question is what keeps a lease alive while a four-mile program or a refrac is under way, and the answer is in the lease. In Sundown Energy v. HJSA No. 3, decided in 2021, the Supreme Court of Texas held that under the lease’s own definition of drilling operations, work other than spudding a new well could hold non-producing tracts in a continuous drilling program [72].

Most of the oil stays in the rock. EIA’s 2013 assessment put shale oil recovery at typically 3 to 7 percent of the oil in place [73]. Injection is the attempt on the rest. The Energy & Environmental Research Center reported in June 2026 that a single cycle of natural gas liquids injected into a Chord well unit in the Middle Bakken raised daily oil rates by up to 470 percent and cumulative oil by about 253 percent over five months [61]. Federal tax law now pays the same for carbon dioxide used in enhanced recovery as for carbon dioxide stored: since July 4, 2025, Section 45Q gives both a base of $17 a metric ton, where enhanced recovery had earned $12; carbon captured from the air by a plant placed in service after 2022 earns a base of $36 [62].

An electric frac fleet runs its pumps on electric power instead of diesel engines. Halliburton says more than half of its North American fleet was electric in 2025 and that electric fleets powered more than half of its delivered horsepower [63]. Liberty, which began generating power for its electric fleet in 2021 and in 2023 launched Liberty Power Innovations as an integrated fuel and power provider, plans about 3 gigawatts of power projects by 2029 [64]. The grid is being planned to follow. ERCOT told a Texas legislator on August 12, 2026 that its Permian Basin Reliability Plan, published in July 2024, studied a Permian load of 23,659 megawatts in 2030 and 26,400 in 2038, and that 765-kilovolt lines are needed by 2030 [66]. Commission staff recommended those lines in April 2025, at a transmission providers’ estimate of $10,114 million and 1,255 new miles, 22 percent more than the 345-kilovolt option [65]. ERCOT says each of its three studies found 765-kilovolt lines needed from 2030, driven mainly by the effect of House Bill 5066 on its load forecast, and that more than 600 utility studies would be invalidated if the lines were delayed or denied [66]. Outside ERCOT, the Southwest Power Pool awarded Southwestern Public Service the first 765-kilovolt project in Texas in its 2025 plan, Commission staff noted [65].

the grid a Permian oilfield on electric power is planning for; study values, not measured load ERCOT STUDY, 2030 Permian load 23,659 MW Permian Basin Reliability Plan The load ERCOT's Permian plan studied for2030, as it told a legislator on Aug. 12, 2026. ERCOT STUDY, 2038 Permian load 26,400 MW the plan's long horizon ERCOT found 765 kV lines needed by 2030 andcalled them the optimal engineering option. PUCT STAFF, APR. 2025 765 kV import paths $10.1 billion 1,255 new miles Utilities' estimate, against $8,277 million and1,676 miles at 345 kV: a 22 percent premium. ERCOT letter to Rep. Charlie Geren, Aug. 12, 2026; PUCT Project No. 55718, staff memorandum of Apr. 17, 2025 ($10,114 million).
Fig. 8The grid the Permian is planning for: ERCOT’s study loads for 2030 and 2038 and the 765-kilovolt import paths as estimated by the transmission providers and reported by Commission staff. Study values, not measured load [65], [66].

Carbon capture tied to production has its permits and its delays. On April 7, 2025, EPA issued the first Class VI permits in Texas, to Oxy Low Carbon Ventures for three wells in Ector County, on former ranch land about 14 miles from Odessa, that would store about 722,000 metric tons of carbon dioxide a year at about 4,400 feet [67]. Texas took over Class VI permitting on December 15, 2025, so the Railroad Commission now issues those permits [74]. Occidental said in August 2026 that full commissioning of STRATOS, its direct air capture plant in Ector County, designed to capture up to 500,000 metric tons of carbon dioxide a year, should begin around the end of 2026, with operations in 2027, when about $400 million of capital for its low carbon business rolls off [68], [75].

Methane can now be seen from orbit. Carbon Mapper’s Tanager-1, launched on August 16, 2024, spotted a leaking pipeline in the Texas Permian on October 9, 2024, and the operator fixed it; by August 16, 2026 the project had published 14,400 methane plumes, and three more satellites are planned [69]. The federal duty to act on what is seen is shrinking. EPA’s 2024 methane rule had its deadlines extended in July 2025 and was amended in April 2026, and on October 29, 2026 EPA proposed to rescind its Super Emitter Program, among other changes, with comments due December 16 [77]. That program let certified third parties report releases of 100 kilograms of methane an hour or more, measured with approved remote sensing, and its start had already been put off to January 22, 2027 [78]. Congress voided EPA’s rule for the methane Waste Emissions Charge in March 2025, and Public Law 119-21 moved the charge to emissions reported for 2034 [79], [80].

the methane rules, 2024 to 2034: what was adopted, extended, voided and proposed; the axis breaks after 2027 2024 2025 2026 2027 2034 Mar. 2024 EPA methane rule OOOOb and OOOOc, 89 FR16820 Sept. 2024 BLM rule enjoined In five states, including Texas Mar. 2025 Charge rule voided Congressional Review Act July 2025 Charge moved to 2034 Pub. L. 119-21; deadlinesextended July 31 Apr. 2026 Rule amended 91 FR 18056 Oct. 29, 2026 Rescission proposed Super Emitter Program;comments to Dec. 16 Dec. 31, 2026 New Mexico: 98 percent Gas capture deadline, 19.15.27NMAC 2034 Charge begins Emissions reported for 2034 Federal Register 89 FR 16820, 90 FR 35966, 90 FR 55671, 91 FR 18056, 91 FR 68234; EPA; 42 U.S.C. 7436(g); BLM; 19.15.27.9 NMAC.
Fig. 9The methane rules for onshore oil and gas, 2024 to 2034, from the Federal Register, EPA, the U.S. Code, the Bureau of Land Management and the New Mexico Administrative Code [77], [79], [80], [81], [82].

The Bureau of Land Management’s 2024 rule charging royalty on gas avoidably lost from federal leases was enjoined on September 12, 2024 in North Dakota, Texas, Montana, Wyoming and Utah, in North Dakota v. Department of the Interior, where it cannot be enforced while the case goes on; elsewhere BLM enforces it, and two of its deadlines will not be enforced before December 10, 2026 [81]. New Mexico moves the other way: by December 31, 2026, its operators must capture at least 98 percent of the gas they produce [82]. The state counts it each year as the gas produced less the gas lost, divided by the gas produced; gas that is sold, used beneficially or flared in an emergency is not lost gas [82].

Much of this is a promise with a date on it. STRATOS, with its well permits since April 2025, now expects operations in 2027 [68], [75]. ERCOT’s 765-kilovolt lines wait on route applications still before the Commission in August 2026, and on load forecasts for 2030 and 2038 [66]. ExxonMobil’s half by 2028 is a target and its one-third an estimate, and Halliburton’s autonomous frac is one job [56], [57]. The Bakken injection result is one unit over five months [61]. What is of record is narrower: two robots on rig floors, the first four-mile wells, half of one company’s frac fleet electric, three permitted injection wells, and a satellite that found a leak.

Each of these technologies brings a title question with it. A refrac or a four-mile program asks what words in the lease hold it [72]. Storage asks whose pore space it is, and in New Mexico the answer starts with the surface owner [76]. An electric oilfield needs easements for generators, substations and the 1,255 miles of new line its grid plan calls for [65]. And a satellite that sees a leak raises the question a royalty owner will ask next: who pays for the gas that was lost?

The record is clear.

Archive builds title from the record: an automated title examination platform for the Permian Basin, beginning with Eddy and Lea counties, New Mexico. The Ledger is published at archiveledger.com.

Colophon

Typeset in DM Serif Display, Inter and JetBrains Mono. Figures drawn by Archive. Drilling history from U.S. patents, the landmark histories of the American Society of Mechanical Engineers, state historical markers and commissions, and agency histories; production and drilling data from the U.S. Energy Information Administration, Baker Hughes and the Railroad Commission of Texas; law from the U.S. and state statutes, codes and courts. Company figures and plans are the companies’ own statements, and forecasts are their authors’ estimates; both are labeled as such.

The Ledger is an editorial publication of Archive Ledger, Inc. It is not legal advice, and it is not a title opinion. Every claim of fact is tied to a numbered source; corrections are welcome at archiveledger.com.

The Ledger and Archive are trademarks of Archive Ledger, Inc. No part of this issue may be reproduced or redistributed without written permission; brief quotation with attribution is welcome. Corrections and permissions: support@archiveledger.com.

The Ledger · No. 004 · November 1, 2026 · © 2026 Archive Ledger, Inc.. All rights reserved.

References

  1. ASME, “Drake Oil Well (Historic Mechanical Engineering Landmark 40),” 1979. [Online]. Available: https://www.asme.org/about-asme/engineering-history/landmarks/40-drake-oil-well
  2. Pennsylvania Historical and Museum Commission, “Drake Well Museum and Park,” n.d. [Online]. Available: https://www.pa.gov/agencies/phmc/historic-sites-and-museums/pahistory2go/drake-well-museum
  3. Penn State University Libraries, Pennsylvania Center for the Book, “Edwin Drake and the Oil Well Drill Pipe,” n.d. [Online]. Available: https://pabook.libraries.psu.edu/literary-cultural-heritage-map-pa/feature-articles/edwin-drake-and-oil-well-drill-pipe
  4. U.S. Energy Information Administration, “U.S. Field Production of Crude Oil (annual, thousand barrels),” 2026. [Online]. Available: https://www.eia.gov/dnav/pet/hist/LeafHandler.ashx?n=PET&s=MCRFPUS1&f=A
  5. e-WV: The West Virginia Encyclopedia (John Edmund Stealey III), “Salt Industry,” n.d. [Online]. Available: https://www.wvencyclopedia.org/entries/149
  6. U.S. Patent Office (Google Patents), “Manner of Uniting Augers to Sinkers for Boring Artesian Wells, U.S. Patent No. 2,243 (William Morris),” September 4, 1841. [Online]. Available: https://patents.google.com/patent/US2243A/en
  7. ASME, “Hughes Two-Cone Drill Bit (Historic Mechanical Engineering Landmark 246, brochure),” August 10, 2009. [Online]. Available: https://www.asme.org/wwwasmeorg/media/resourcefiles/aboutasme/who%20we%20are/engineering%20history/landmarks/246-hughes-two-cone-drill-bit-1909.pdf
  8. U.S. Patent Office (Google Patents), “Improvement in exploding torpedoes in artesian wells, U.S. Patent No. 47,458 (E. A. L. Roberts),” April 25, 1865. [Online]. Available: https://patents.google.com/patent/US47458A/en
  9. U.S. Patent Office (Google Patents), “Drill, U.S. Patent No. 930,758 (Howard R. Hughes),” August 10, 1909. [Online]. Available: https://patents.google.com/patent/US930758A/en
  10. Texas State Historical Association, Handbook of Texas (Wooster, Sanders), “Spindletop Oilfield,” rev. April 2, 2019. [Online]. Available: https://www.tshaonline.org/handbook/entries/spindletop-oilfield
  11. Texas Historical Commission, “Lucas Gusher (Texas Centennial marker, Atlas 5245010540),” 1936. [Online]. Available: https://atlas.thc.texas.gov/Details/5245010540
  12. U.S. Patent Office (Google Patents), “Three-cone bit, U.S. Patent No. 1,983,316 (Scott and Garfield; Hughes Tool Co.),” December 4, 1934. [Online]. Available: https://patents.google.com/patent/US1983316A/en
  13. ASME, “First Ram-Type Blowout Preventer (Historic Mechanical Engineering Landmark 227),” July 14, 2003. [Online]. Available: https://www.asme.org/about-asme/engineering-history/landmarks/227-first-ram-type-blowout-preventer
  14. Oklahoma Historical Society (Dianna Everett), “Seismograph (Encyclopedia of Oklahoma History and Culture),” January 15, 2010. [Online]. Available: https://www.okhistory.org/publications/enc/entry?entry=SE008
  15. SLB, “1920s (company history),” n.d. [Online]. Available: https://www.slb.com/about/who-we-are/our-history/1920s
  16. Pennsylvania Historical and Museum Commission (data.pa.gov), “First Oil Pipeline (marker 1954HM00039),” November 15, 1954. [Online]. Available: https://data.pa.gov/resource/xt8f-pzzz.json?$where=id='1954HM00039'
  17. Pennsylvania Historical and Museum Commission (data.pa.gov), “Tidewater Pipe Co. (marker 1949HM00097),” August 8, 1949. [Online]. Available: https://data.pa.gov/resource/xt8f-pzzz.json?$where=id='1949HM00097'
  18. Railroad Commission of Texas, “RRC History,” n.d. [Online]. Available: https://www.rrc.texas.gov/about-us/rrc-history/
  19. Cornell LII (U.S. Code), “15 U.S.C. 715b (Connally Hot Oil Act, Feb. 22, 1935, ch. 18, 49 Stat. 31),” current. [Online]. Available: https://www.law.cornell.edu/uscode/text/15/715b
  20. New Mexico EMNRD, Oil Conservation Division, “Oil Conservation Commission,” n.d. [Online]. Available: https://www.emnrd.nm.gov/ocd/occ-info/
  21. Texas State Historical Association, Handbook of Texas (Palmer, Johnson), “Big Inch and Little Big Inch,” rev. June 30, 2023. [Online]. Available: https://www.tshaonline.org/handbook/entries/big-inch-and-little-big-inch
  22. AAPG Explorer (Lawrence H. Skelton), “Digging the Roots of Hydraulic Fracturing,” September 1, 2015. [Online]. Available: https://www.aapg.org/news-and-media/explorer/digging-the-roots-of-hydraulic-fracturing/
  23. U.S. DOE, National Energy Technology Laboratory, “Factsheet for Partnership Field Validation Test (Southwest Regional Partnership, SACROC),” c. 2008. [Online]. Available: https://www.netl.doe.gov/sites/default/files/netl-file/10-SWP_SACROC%20EOR%20Sequestration_Oil.pdf
  24. Texas State Historical Association, Handbook of Texas (Diana J. Kleiner), “Lufkin Industries,” March 1, 1995. [Online]. Available: https://www.tshaonline.org/handbook/entries/lufkin-industries
  25. U.S. Congress, Statutes at Large (legislink mirror), “An Act To amend an Act entitled "An Act to regulate commerce" (Hepburn Act), ch. 3591, 34 Stat. 584,” June 29, 1906. [Online]. Available: https://govtrackus.s3.amazonaws.com/legislink/pdf/stat/34/STATUTE-34-Pg584.pdf
  26. U.S. Congress, Statutes at Large (govinfo), “Natural Gas Act, ch. 556, 52 Stat. 821,” June 21, 1938. [Online]. Available: https://www.govinfo.gov/content/pkg/STATUTE-52/pdf/STATUTE-52-Pg821.pdf
  27. U.S. Supreme Court (Cornell LII), “Ohio Oil Co. v. Indiana, 177 U.S. 190,” April 9, 1900. [Online]. Available: https://www.law.cornell.edu/supremecourt/text/177/190
  28. Texas State Historical Association, Handbook of Texas (David F. Prindle), “Railroad Commission,” rev. June 1, 1995. [Online]. Available: https://www.tshaonline.org/handbook/entries/railroad-commission
  29. Justia (read via pplx.py fetch; WebFetch 403), “NMSA 1978 70-2-17, Equitable allocation of allowable production; pooling; spacing (2024 New Mexico Statutes),” 2024 code. [Online]. Available: https://law.justia.com/codes/new-mexico/chapter-70/article-2/section-70-2-17/
  30. Railroad Commission of Texas, “RRC Hits New Record in Tackling Orphaned Wells,” September 30, 2026. [Online]. Available: https://www.rrc.texas.gov/news/rrc-hits-new-record-in-tackling-orphaned-wells/
  31. Permian Resources Corporation, “Permian Resources Announces Strong Second Quarter 2026 Results and Updated Full Year Guidance,” August 5, 2026. [Online]. Available: https://permianres.com/permian-resources-announces-strong-second-quarter-2026-results-and-updated-full-year-guidance/
  32. U.S. Energy Information Administration, “Longer wells boost Permian crude oil and natural gas production (Today in Energy),” August 19, 2026. [Online]. Available: https://www.eia.gov/todayinenergy/detail.php?id=67984
  33. U.S. DOE, National Energy Technology Laboratory, “NETL Energy Innovations: Hydraulic Fracturing (25th anniversary fact sheet EI-04),” November 2024. [Online]. Available: https://netl.doe.gov/sites/default/files/2024-12/25thAnniversary/EI-04_Hydraulic%20Fracturing.pdf
  34. North Dakota Geological Survey (Julie LeFever), “Oil Production from the Bakken Formation: A Short History (NDGS Newsletter vol. 32, no. 1),” 2005. [Online]. Available: https://www.dmr.nd.gov/ndgs/documents/newsletter/2005Winter/pdf/BakkenFormation.pdf
  35. Texas State Historical Association, Handbook of Texas (Kleiner, rev. Jasinski), “Mitchell Energy and Development Corporation,” rev. September 9, 2020. [Online]. Available: https://www.tshaonline.org/handbook/entries/mitchell-energy-and-development-corporation
  36. U.S. Energy Information Administration, “U.S. Field Production of Crude Oil (annual),” 2026. [Online]. Available: https://www.eia.gov/dnav/pet/hist/LeafHandler.ashx?n=PET&s=MCRFPUS1&f=A
  37. Baker Hughes, “10-30-2026 North_America Rig_Count Report.xlsx (NAM Summary),” October 30, 2026. [Online]. Available: https://rigcount.bakerhughes.com/static-files/536a9107-55d7-4f9f-946b-002dcbe33f63
  38. Railroad Commission of Texas, “Texas Drilling Permit and Completion Statistics for September 2026,” October 12, 2026. [Online]. Available: https://www.rrc.texas.gov/news/texas-drilling-permit-and-completion-statistics-for-september-2026/
  39. Railroad Commission of Texas, “News (monthly drilling permit statistics, 08/06/2026, 09/09/2026, 10/12/2026),” October 31, 2026. [Online]. Available: https://www.rrc.texas.gov/news/
  40. U.S. Energy Information Administration, “Short-Term Energy Outlook, October 2026 (full report PDF; Tables 4a, 5a, 10a),” October 6, 2026. [Online]. Available: https://www.eia.gov/outlooks/steo/pdf/steo_full.pdf
  41. U.S. Energy Information Administration, “Crude Oil Production (monthly by state), release of 10/30/2026,” October 30, 2026. [Online]. Available: https://www.eia.gov/dnav/pet/pet_crd_crpdn_adc_mbblpd_m.htm
  42. U.S. Energy Information Administration, “New Mexico Field Production of Crude Oil (monthly series),” October 30, 2026. [Online]. Available: https://www.eia.gov/dnav/pet/hist/LeafHandler.ashx?n=PET&s=MCRFPNM2&f=M
  43. Kinder Morgan, Inc., “Kinder Morgan Reports Record Third Quarter 2026 Financial Results,” October 21, 2026. [Online]. Available: https://ir.kindermorgan.com/news/news-details/2026/Kinder-Morgan-Reports-Record-Third-Quarter-2026-Financial-Results/default.aspx
  44. Federal Reserve Bank of Dallas, “Texas Business Outlook Surveys: Dallas Fed Energy Survey, Third Quarter 2026,” September 30, 2026. [Online]. Available: https://www.dallasfed.org/research/surveys/des/2026/2603
  45. Energy Transfer LP (SEC EDGAR), “Energy Transfer Q2 2026 results (Form 8-K, Ex. 99.1),” August 4, 2026. [Online]. Available: https://www.sec.gov/Archives/edgar/data/0001276187/000127618726000033/ex991eterq22026.htm
  46. Enbridge Inc., “Bay Runner Twin: Another feeder for Gulf Coast's LNG export boom,” August 6, 2026. [Online]. Available: https://www.enbridge.com/stories/2026/august/bay-runner-twin-permian-gas-pipelines-feeder-gulf-coast-lng-exports
  47. U.S. Energy Information Administration, “U.S. natural gas production reached a record high in July 2026 (Today in Energy),” October 2, 2026. [Online]. Available: https://www.eia.gov/todayinenergy/detail.php?id=68225
  48. Targa Resources Corp., “Targa Resources Corp. Announces 20-Year Agreements with ExxonMobil and Three New Natural Gas Processing Plants in the Permian Delaware,” August 17, 2026. [Online]. Available: https://www.targaresources.com/news-releases/news-release-details/targa-resources-corp-announces-20-year-agreements-exxonmobil-and
  49. New Mexico State Records Center and Archives, “19.15.16 NMAC, Drilling and Production (19.15.16.15 Horizontal Wells),” current (am. 06/26/2018, 11/27/2018). [Online]. Available: https://www.srca.nm.gov/parts/title19/19.015.0016.html
  50. Justia (read via pplx.py fetch; WebFetch 403), “NMSA 1978 70-2-17 (2024 New Mexico Statutes),” 2024 code. [Online]. Available: https://law.justia.com/codes/new-mexico/chapter-70/article-2/section-70-2-17/
  51. Texas Third Court of Appeals (txcourts.gov), “Opinion, Railroad Commission of Texas and Magnolia Oil & Gas Operating LLC v. Opiela, No. 03-21-00258-CV,” June 30, 2023. [Online]. Available: https://search.txcourts.gov/SearchMedia.aspx?MediaVersionID=918e4d08-789c-42e6-b958-6bdebad71ff3&coa=coa03&DT=Opinion&MediaID=dba90993-7f5b-4884-bb24-5c98019b581e
  52. Supreme Court of Texas (txcourts.gov), “Orders on Causes, January 31, 2025: Elsie Opiela and Adrian Opiela, Jr. v. Railroad Commission of Texas and Magnolia Oil & Gas Operating LLC, No. 23-0772,” January 31, 2025. [Online]. Available: https://www.txcourts.gov/supreme/orders-opinions/2025/january/january-31-2025/
  53. Supreme Court of Texas (txcourts.gov), “Texas Rules of Appellate Procedure, Rule 56.3, Settled Cases (compilation updated with amendments effective 01/01/2026; 56.3 unchanged since its 2002 comment),” January 1, 2026. [Online]. Available: https://txcourts.gov/media/1457526/texas-rules-of-appellate-procedure.pdf
  54. New Mexico State Records Center and Archives, “19.15.27 NMAC, Venting and Flaring of Natural Gas,” eff. 05/25/2021. [Online]. Available: https://www.srca.nm.gov/parts/title19/19.015.0027.html
  55. Helmerich & Payne, “H&P & ExxonMobil Expand Deployment of FlexRobotics Technology,” October 7, 2026. [Online]. Available: https://ir.hpinc.com/news/press-releases/news-details/2026/HP--ExxonMobil-Expand-Deployment-of-FlexRobotics-Technology/default.aspx
  56. ExxonMobil, “Technology and people driving the next generation of drilling in the Permian (Permian Basin newsroom),” October 26, 2026. [Online]. Available: https://corporate.exxonmobil.com/locations/united-states/permian-basin/newsroom
  57. Halliburton, “ZEUS IQ Powers the First Fully Autonomous Fracturing Platform,” January 2026. [Online]. Available: https://www.halliburton.com/en/resources/world-oil-zeus-iq-first-fully-autonomous-fracturing-platform
  58. SLB, “Schlumberger Introduces Neuro Autonomous Solutions,” September 22, 2022. [Online]. Available: https://www.slb.com/newsroom/press-release/2022/pr-2022-09-22-neuro-solutions
  59. Permian Resources Corporation, “Permian Resources Announces Strong Second Quarter 2026 Results and Updated Full Year Guidance,” August 5, 2026. [Online]. Available: https://permianres.com/permian-resources-announces-strong-second-quarter-2026-results-and-updated-full-year-guidance/
  60. Chord Energy, “Chord Energy Q1 2026 results (earnings release, SEC EDGAR),” May 5, 2026. [Online]. Available: https://www.sec.gov/Archives/edgar/data/1486159/000148615926000017/chrd-q12026earningsrelease.htm
  61. Energy & Environmental Research Center, University of North Dakota (BPOP), “BPOP Webinar: Bakken EOR Case Study, Results of the Teal Well NGL Huff and Puff Pilot,” June 4, 2026. [Online]. Available: https://bpop.undeerc.org/Abstract.aspx?id=320
  62. Cornell LII (U.S. Code), “26 U.S.C. 45Q, Credit for carbon oxide sequestration (as amended by Pub. L. 119-21, sec. 70522),” current. [Online]. Available: https://www.law.cornell.edu/uscode/text/26/45Q
  63. Halliburton, “2025 Sustainability Report,” 2026. [Online]. Available: https://ir.halliburton.com/static-files/7cd3e682-47a6-45d3-9dff-b64b33a489a2
  64. Liberty Energy, “2025 Annual Report,” March 2026. [Online]. Available: https://libertyenergy.com/wp-content/uploads/2026/03/LibertyEnergy-2025AnnualReport-webOptimizedSpreads.pdf
  65. Public Utility Commission of Texas (Interchange), “Staff memorandum, Project No. 55718 (Permian Basin Reliability Plan import paths),” April 17, 2025. [Online]. Available: https://interchange.puc.texas.gov/Documents/55718_106_1490800.PDF
  66. Electric Reliability Council of Texas, “Re: Permian Basin Reliability Plan and 765 kV Transmission Facilities (letter to Rep. Charlie Geren),” August 12, 2026. [Online]. Available: https://www.ercot.com/files/docs/2026/08/20/Rep.-Geren-Response-2026-08-12.pdf
  67. U.S. Environmental Protection Agency, “EPA Issues Final Permits for Geologic Sequestration of Carbon Dioxide in Texas,” April 7, 2025. [Online]. Available: https://www.epa.gov/newsreleases/epa-issues-final-permits-geologic-sequestration-carbon-dioxide-texas
  68. Occidental Petroleum, “Q2 2026 Occidental Petroleum earnings call (edited transcript),” August 6, 2026. [Online]. Available: https://www.oxy.com/siteassets/documents/investors/quarterly-earnings/oxy2q26transcript.pdf
  69. Carbon Mapper, “Tanager-1: two years of turning satellite data into methane action,” August 17, 2026. [Online]. Available: https://carbonmapper.org/articles/tanager-1-two-years-of-turning-satellite-data-into-methane-action
  70. ConocoPhillips, “Technology and innovation are driving Lower 48 efficiency gains,” August 12, 2021. [Online]. Available: https://www.conocophillips.com/spiritnow/story/technology-and-innovation-are-driving-lower-48-efficiency-gains/
  71. GTI Energy for U.S. DOE (OSTI), “HFTS-1 (Final Report), DE-FE00024292,” September 29, 2023. [Online]. Available: https://www.osti.gov/biblio/2006840
  72. Justia (read via pplx.py fetch), “Sundown Energy LP v. HJSA No. 3, LP (Tex. 2021),” 2021. [Online]. Available: https://law.justia.com/cases/texas/supreme-court/2021/19-1054.html
  73. U.S. Energy Information Administration, “Technically Recoverable Shale Oil and Shale Gas Resources (overview),” June 2013. [Online]. Available: https://www.eia.gov/analysis/studies/worldshalegas/pdf/overview.pdf
  74. EPA (Federal Register, JSON API), “Texas Underground Injection Control (UIC) Program; Class VI Primacy Application, 90 FR 51021,” November 14, 2025. [Online]. Available: https://www.federalregister.gov/api/v1/documents/2025-19898.json
  75. 1PointFive (Occidental), “Ector County, TX (STRATOS),” n.d. (accessed October 31, 2026). [Online]. Available: https://www.1pointfive.com/projects/ector-county-tx
  76. New Mexico Legislature, “HB 458, Geologic Carbon Dioxide Storage Stewardship Act (enrolled text; bill history),” April 7, 2025. [Online]. Available: https://www.nmlegis.gov/Sessions/25%20Regular/final/HB0458.pdf
  77. EPA (Federal Register, JSON API), “Additional Reconsideration: Oil and Natural Gas Sector Climate Review (proposed rule), 91 FR 68234; with 90 FR 35966 (07/31/2025), 90 FR 55671 (12/03/2025), 91 FR 18056 (04/09/2026),” October 29, 2026. [Online]. Available: https://www.federalregister.gov/api/v1/documents/2026-22082.json
  78. U.S. Environmental Protection Agency, “Methane Super Emitter Program,” updated September 16, 2026. [Online]. Available: https://www.epa.gov/compliance/methane-super-emitter-program
  79. U.S. Environmental Protection Agency, “Waste Emissions Charge,” 2025. [Online]. Available: https://www.epa.gov/inflation-reduction-act/waste-emissions-charge
  80. Cornell LII (U.S. Code), “42 U.S.C. 7436, Methane emissions and waste reduction incentive program,” current. [Online]. Available: https://www.law.cornell.edu/uscode/text/42/7436
  81. Bureau of Land Management, “2024 Waste Prevention Rule,” n.d. (reflects 12/15/2025 extension). [Online]. Available: https://www.blm.gov/about/laws-and-regulations/2024-waste-prevention-rule
  82. New Mexico State Records Center and Archives, “19.15.27 NMAC, Venting and Flaring of Natural Gas,” eff. 05/25/2021. [Online]. Available: https://www.srca.nm.gov/parts/title19/19.015.0027.html